Proof, Not Promises

Case
Studies

Real programmes, controlled end to end. A closer look at how Salerno turns scope, schedule and cost into delivery certainty on the world's most demanding projects.

NDA

Figures shown are indicative and rounded for illustration. Detailed project data, contract values and client documents are held under confidentiality agreements and are not disclosed. Client references are published with consent.

Flagship Case · Oil & Gas Security

UOSF — Aramco &
General Dynamics

Upgrade of Onshore-Offshore Security Facilities: a stand-alone Integrated Security Systems Platform delivered to Saudi Aramco across its maritime jurisdiction. Marcelo Robles served as Project Control Manager — Key Personnel, approved by Aramco at grade K3.

Aramco K3 Approved · Key Personnel

Integrated Security
Systems Platform

Design detail development, procurement, construction, commissioning, performance testing and final handover to Saudi Aramco of a stand-alone platform — all hardware and software supporting security operations within Aramco's maritime jurisdiction.

Offshore security platform with long-range radar mast, Saudi Aramco UOSF programme
Client
Aramco · General Dynamics
Duration
~3 Years
Award → MCC
Nov 2017 → Nov 2020
Scope
32 Sites · Onshore & Offshore
32
Onshore & Offshore Sites
3,000
CPM Activities
6,000
Logic Relationships
K3
Aramco Key Personnel

The Platform We Controlled

LRDAS — Long Range Detection & Assessment: Marine Surveillance Radars (MSRs), Long Range Thermal Imagers (LRTIs)
C2I — L3-Harris: Command, Control & Intelligence
Support systems: communications & structured cabling, electrical (power, HVAC), structural (towers, poles, cabinets), fire alarm & detection
Integration with AIS and Vessel Tracking Management System (VTMS); replacement of long-range cameras

The Control Challenge

32 simultaneous onshore & offshore sites under one programme
Offshore campaigns exposed to weather risk and vessel logistics
Strict Aramco standards, performance acceptance tests and handover gates
Active & passive invoicing tied to certified physical progress

Planning & Scheduling

WBS by phase: Engineering, Procurement, Construction, Mechanical Completion, Commissioning, Performance Acceptance Tests
CPM with 3,000 activities & 6,000 relationships — no lag/lead, activities ≤25 days, total floats ≤60 days
4 schedule levels — milestones, phases & disciplines, detailed activities, and site/system/item level with quantity & productivity
Resource loading (labour & non-labour); manhours spread and exported for reporting

Monitoring & Control

Physical progress via Progress Monitoring System (PMS)
Earned value — BCWS · BCWP · ACWP — with Schedule & Performance indices
Forecast what-if on cumulative current trends
Recovery & mitigation plans · claims prevention

Reporting

Weekly & monthly: baseline vs current schedule, critical path without lag, S-curves & histograms
Productivity analysis for steel-structure hook-up (Aramco Tanajib)
Daily reports and manpower lookahead by skill for onshore sites and offshore platforms
Monthly company physical-progress certificate for active & passive invoices

Risk & Logistics

PRM workshops for uncertain activities (e.g. bad-weather offshore campaign impacts)
Vessel deployments and preliminary activities — prefabrication of bulk materials & heavy/medium steel structures
Preliminary tools management (e.g. scaffolding from design to in-field installation)
Lesson learned: as-built engineering documentation & red mark-up data management

Case 02 · Chemical & Industrial

Solvay Spritz —
Wood & Fincimec

A chemical plant programme at Solvay's Usine Tavaux in France. Salerno ran project control for Fincimec Impianti Industriali on the WP-A execution scope, under engineering contractor Wood Italiana — delivered on our own structured project control system.

Owner
Solvay Specialty Polymers
Engineering
Wood Italiana SRL
Execution · WP-A
Fincimec Impianti
Location
Tavaux, France
3
Bunker Sectors · N·C·S
8
Work Package Disciplines
~13,000
Planned Man-hours
100%
Planned to MCC · Dec 2024

The Scope We Controlled

Areas: Bunker (North, Center, South), Degasser, Area AA, Area BB — overall plant
Work packages: Piping, Structures, Supports, Equipment, Electrical, Instrumentation, Painting & Insulation, Punchlist & Test Pack
Small-bore installation across all three bunker sectors
Ramp from 22.4% (Sep) to 100% (Dec 2024) on plan

Our Project Control System

A structured, in-house control database: Units · Areas · Disciplines · Work Packages · WBS
Activity definition by site, discipline and system, with quantity & productivity per item
Budget by area, monthly S-curves and manhour spread, progress by PMS
Earned-value activity analysis (planned vs revised vs actual) per work package
I particularly appreciated the continuous efforts and dedication in having punctual and accurate analysis of the project's course and trends — KPI indicators that allowed good governance up to system handover, on time and cost.
Pietro Nicoletti · Site Manager, Fincimec S.p.A. · Signed reference, March 2025

More Programmes

A Track Record
Across Industries

From EDF Flamanville nuclear to PROMAN ammonia and the AWS Milan data centre, every Salerno engagement is controlled with the same discipline. Explore the full portfolio, or ask us for a detailed case in your sector.

Want This Level of
Control on Your Project?

Talk to Salerno →